Loading... Please wait...
Loading... Please wait...
Copyright © 2024 NBI Infrastructure DAC t/a National Broadband Ireland Registered in Ireland No.631656 and its registered office is 3009 Lake Drive, Citywest, Dublin 24 D24 H6RR. All Rights Reserved.
Simply enter your eircode and email address in the boxes below to ensure you are kept up to date with the very latest information regarding the National Broadband rollout. If we have your details, we can contact you when service becomes available in your area.
NBI does not sell your personal information. Your data is strictly used within NBI group of companies. Please refer to our Privacy Policy for further information.
After the designs have been approved, work can start on the ground. This includes everything from readying existing infrastructure to laying fibre.
NBI’s detailed design process covers infrastructure, power and footprint required, drawings, openeir works, Local Authority requirements and revised cost analysis.
Physical surveys are required to examine the existing pole and duct network for inclusion in the design.